SSH Building

MOJ Pathway

MOJ Pathway

Location: Wiltshire

Project Start: N/A

Works Duration: 3 days

Description:

The SSH Building team carried out a pathway repair where they removed the old pathway surface and replaced with a new surface.

"SSH Building transformed our pathways with precision and expertise. The repaired walkways now boast both functionality and safety grateful to SSH Building for a job well done!"
K. Foster
Facilities Manager
Latest Works
  • 24 x MOD Block Kitchens
    24 x MOD Block Kitchens

    MOD Kitchenette Location: Hampshire Project Start: N/A Works Duration: 2…

  • MOJ Security Block
    MOJ Security Block

    MOJ Security Block Location: Hampshire Project Start: N/A Works Duration:…

  • MOJ Shower Block
    MOJ Shower Block

    MOJ Shower Block Location: Hampshire Project Start: N/A Works Duration:…

  • Healthcare Facility Breakroom
    Healthcare Facility Breakroom

    Healthcare Facility Breakroom Location: Hampshire Project Start: N/A Works Duration:…

  • MOJ Visitor Hut
    MOJ Visitor Hut

    MOJ Visitor Hut Location: Hampshire Project Start: N/A Works Duration:…