SSH Building

MOJ Ground Floor Shower

MOJ Ground Floor Shower

Location: Hampshire

Project Start: N/A

Works Duration: 2 days

Description:

The SSH Building team carried out a whiterocking of a ceiling and sealing the whiterock with silicone.

"SSH Building did a fantastic job whiterocking our ceiling. It makes the shower look so much better and more waterproof, and we appreciate the meticulous work by SSH Building. Thank you!"
A. Turner
FM Manager
Latest Works
  • 24 x MOD Block Kitchens
    24 x MOD Block Kitchens

    MOD Kitchenette Location: Hampshire Project Start: N/A Works Duration: 2…

  • MOJ Security Block
    MOJ Security Block

    MOJ Security Block Location: Hampshire Project Start: N/A Works Duration:…

  • MOJ Shower Block
    MOJ Shower Block

    MOJ Shower Block Location: Hampshire Project Start: N/A Works Duration:…

  • Healthcare Facility Breakroom
    Healthcare Facility Breakroom

    Healthcare Facility Breakroom Location: Hampshire Project Start: N/A Works Duration:…

  • MOJ Visitor Hut
    MOJ Visitor Hut

    MOJ Visitor Hut Location: Hampshire Project Start: N/A Works Duration:…