Healthcare Facility Guttering and Downpipe

Healthcare Facility Guttering and Downpipe

Location: Hampshire

Project Start: N/A

Works Duration: 2 days

Description:

The SSH Building team carried out a gutter and downpipe replacement at a NHS facility.

"SSH Building did a fantastic job replacing our guttering. The process was smooth, and the new gutters look excellent. Thanks to SSH Building for their professional work!"
S. Miller
FM Manager
Latest Works
  • 24 x MOD Block Kitchens
    24 x MOD Block Kitchens

    MOD Kitchenette Location: Hampshire Project Start: N/A Works Duration: 2…

  • MOJ Security Block
    MOJ Security Block

    MOJ Security Block Location: Hampshire Project Start: N/A Works Duration:…

  • MOJ Shower Block
    MOJ Shower Block

    MOJ Shower Block Location: Hampshire Project Start: N/A Works Duration:…

  • Healthcare Facility Breakroom
    Healthcare Facility Breakroom

    Healthcare Facility Breakroom Location: Hampshire Project Start: N/A Works Duration:…

  • MOJ Visitor Hut
    MOJ Visitor Hut

    MOJ Visitor Hut Location: Hampshire Project Start: N/A Works Duration:…